A series of roadworks are soon to be taking place on two roads in Southampton.
SGN will be connecting properties along the road to their gas network and changing the location of an existing pipe.
Works are set to take place between January 29 and February 6 on Botley Road and between January 31 and February 7 on Portsmouth Road.
Both sets of works are likely to cause delays and traffic will be controlled by two-way signals.
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules hereLast Updated:
Report this comment Cancel